Installation von Akustikwandabsorbern

Karriere

Teamwork makes the dreamwork

One of our current projects was the subsequent acoustic refurbishment of the casino of the University Hospital Schleswig-Holstein at the Lübeck campus. After an extensive planning and preparation period, our production employees were able to manufacture 120 “apn® Vinta A (z) circle” acoustic ceiling sails in just one week.

Who now thinks, “wow, that was fast!”, has underestimated the skills of our assembly crew: The 120 green and white circles could be assembled in only one working day (!). Even if the favorable conditions on site and the easy direct assembly with our apn® sys-z profile played an additional role, the grandiose hand-in-hand work of our crew contributed to this success. We love what can be accomplished with great teamwork!